Cement Packing
Plant

Kembla Grange
Image4

The BPS Bagging Plant Modernisation delivers a step change in safety, efficiency and product quality through the integration of advanced automated systems. Designed to strengthen reliability and reduce operational risk, the upgrade minimises dust and noise while improving overall plant performance. 

Central to the project is a compact, state-of-the-art mixer and weigher housed within a renewed Dry Storage Tower, linked via a fully enclosed Z-Conveyor to a new 17-metre-high processing structure. An automated packing system significantly reduces operator exposure and virtually eliminates airborne dust. 

The multi-level facility is carefully integrated with existing operations, accommodating reclaim systems at ground, operational packing at Level 1, hopper and weigh systems at Level 2, screening and feed bins across mezzanines, and product infeed above—delivering a streamlined, future-ready industrial asset.

Image3
Image1_000

Project Details

Client

Independent Cement & Lime

Location

Kembla Grange